Reconstruction of Zhytomyr Rehabilitation Centre  

Health and Well-beingReduced Inequalities
Budget
4 000 000 Eur (Targeted contribution of the Ministry of National Defence of the Republic of Lithuania)
Year
2024-2027
Duration
36 months
CPVA role
Project implementer

Aim of the project 

The renovation and modernisation of the Zhytomyr Military Hospital unit that provides rehabilitation services for wounded soldiers. 

Project activities and status: 

  1. Preparing a technical project for the reconstruction of the building.
  2. Reconstructing the building of the Zhytomyr Rehabilitation Centre.
  3. Equipping the Zhytomyr Rehabilitation Centre with the necessary equipment.

Identification and coordination with the beneficiary regarding the necessary works to be carried out. In April 2025, the first procurement of design services took place, during which no service provider was selected. In May 2025, the procurement for design services is being carried out again.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.