Reconstruction of Zhytomyr Rehabilitation Centre  

Health and Well-beingReduced Inequalities
Budget
4 000 000 Eur (Targeted contribution of the Ministry of National Defence of the Republic of Lithuania)
Year
2024-2027
Duration
32 months
CPVA role
Project implementer

Objective of the project 

The renovation and modernisation of the Zhytomyr hospital unit that provides rehabilitation services for wounded soldiers. 

Project activities and status: 

  1. Preparing a technical project for the reconstruction of the building. 
  2. Reconstructing the building of the Zhytomyr Rehabilitation Centre.
  3. Equipping the Zhytomyr Rehabilitation Centre with the necessary equipment.

The technical design service contract was signed on May 28, 2025.  The technical project was prepared on December 21, 2025 and received a positive expert assessment. 

On February 6, 2026, a tender for construction work was announced. On April 24, 2026, a contract for the construction was signed.

In addition, medical and rehabilitation equipment is being procured to equip the facility. Public procurement procedures for these purchases were launched in   September 2026.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.