![C0030.MP4.09_03_08_47.Still004 (2)](https://cpva.lt/wp-content/uploads/elementor/thumbs/C0030.MP4.09_03_08_47.Still004-2-2-qrit6os6cg4ne9rqpdvlsb49vkdo1bkx03rb3evtzc.jpg)
![C0019.MP4.08_54_54_26.Still001 (1)](https://cpva.lt/wp-content/uploads/elementor/thumbs/C0019.MP4.08_54_54_26.Still001-1-2-qrit6nuc5m3d2nt3uvgz7tcta6iatmh6nz3tm4x85k.jpg)
![C0002.MP4.08_15_44_40.Still002 (2)](https://cpva.lt/wp-content/uploads/elementor/thumbs/C0002.MP4.08_15_44_40.Still002-2-2-qrit6lynry0sffvu5unq2ttw3erke89pzpsunl00i0.jpg)
![IMG-20240619-WA0061 (1)](https://cpva.lt/wp-content/uploads/elementor/thumbs/IMG-20240619-WA0061-1-3-qrit6uf7hgcdbxjjsgbd79p1fvlvbi7b0vo7z2ngy0.jpg)
![IMG-20240619-WA0055 (1) (1)](https://cpva.lt/wp-content/uploads/elementor/thumbs/IMG-20240619-WA0055-1-1-3-qrit6uf7hgcdbxjjsgbd79p1fvlvbi7b0vo7z2ngy0.jpg)
![IMG-20240619-WA0064 (2)](https://cpva.lt/wp-content/uploads/elementor/thumbs/IMG-20240619-WA0064-2-3-qrit6vd1oadnnji6mypzrrgi19h8j7b1d0bpgcm2rs.jpg)
![C0002.MP4.08_15_28_09.Still001 (3)](https://cpva.lt/wp-content/uploads/elementor/thumbs/C0002.MP4.08_15_28_09.Still001-3-2-qrit6l0tl3zi3tx7bc93ic2fi0w76j5znl5d6b1eo8.jpg)
![C0004.MP4.08_16_10_32.Still002 (1)](https://cpva.lt/wp-content/uploads/elementor/thumbs/C0004.MP4.08_16_10_32.Still002-1-2-qrit6mwhys22r1uh0d2cnblcosmxlxdgbugc4uymbs.jpg)
![Construction of the shelter Irpin (1)](https://cpva.lt/wp-content/uploads/elementor/thumbs/Construction-of-the-shelter-Irpin-1-qrj502mr9ag5lbvir9dg6ypzx3pni4bu5k9xrg5u2w.jpg)
![Construction of the shelter Irpin (4)](https://cpva.lt/wp-content/uploads/elementor/thumbs/Construction-of-the-shelter-Irpin-4-qrj504ifmyiq8jssga6pby8x3vgdxijattkwq031qg.jpg)
Objective of the project
To instal the anti-radiation shelter in a kindergarten in Irpin (Kozyntsi village).
Project partner
Ukraine’s Irpin City Council
Charity organisation, International Charitable Foundation “savED”.
Project activities and status
- Preparation of the technical project. The technical project has been prepared by the Municipality of Irpin.
- Installation of an anti-radiation shelter. Following public procurement procedures, the contract was signed and all the contract works (dismantling, general construction works inside and outside, ventilation, electrical, plumbing and heating, sewerage, fire alarm installation, evacuation system installation) were carried out.
- Furnishing of the shelter with furniture and equipment. Following public procurement procedures, furniture and equipment for the shelter were purchased (beds and bedding, tables, chairs, poufs, wardrobes, cupboards, cabinets, couches, gymnastic mats, exercise boards, mini-kitchen, etc.)
- Informing the public about the project. On 19 June 2024, the official opening of the shelter took place and an information board at the entrance to the shelter has been placed.